Latest post Fri, Nov 29 2019 4:47 PM by Cunninghun. 0 replies.
Page 1 of 1 (1 items)
Sort Posts: Previous Next
  • Fri, Nov 29 2019 4:47 PM

    • Cunninghun
    • Not Ranked
    • Joined on Sat, Apr 1 2006
    • PRAGUE
    • Posts 20
    • Points 200

    Script Sync - is it possible to update the Script?

    Hello, a quick question, I am new to Script Sync and I was wondering if it is possible to do the following (haven't found it in Editing Guide manual):
    Say I have a certain (current) version of Script which I import and start Script sync-ing dailies. What if there is coming a new updated version of the Script? Is there an easy way to slide in the newer version (replacing the old one) and keep already Script sync-ed clips synced to the outdated Script?
    Or what is the best practice to deal with Scripts being updated and changed? I assume one way to do it would be to edit manually the Script but I am hoping for some more sophisticated procedure...
    My preferred workflow would be to break down the Script per Scene (which would effectively solve my problem) but I am requested to work with FULL Script...
    Thanks in advance for any hint or help.

    On AVID since ever.

Page 1 of 1 (1 items)

© Copyright 2011 Avid Technology, Inc.  Terms of Use |  Privacy Policy |  Site Map |  Find a Reseller